3rd Rail Transit Products

Ben Franklin Bridge

Location: Camden, NJ and Philadelphia, PA.

Owner: Delaware River Port Authority

The work to be completed under this $150 million dollar contract consists of a complete replacement of the existing PATCO track, maintenance walkways, railings, structural repairs and bridge chambers.

Selco Scope

  • All 3rd Rail Transit track material including bridge chambers, steel work, 3rd Rail coverboards, brackets, insulators and expansion material and hardware.
  • Replace existing bridge chambers (36) with new fabricated stainless steel chambers up to 9' X 10' X 8' The chambers included all of the structural steel support steel.
  • Impedance bond walkways.
  • Walkway supports.
  • Fixation channels.


No. 7 Line Extension

No. 7 Line Extension

Location: Manhattan, New York

Owner: New York City Transit Authority

The No. 7 Line Subway is being extended from Times Square to W. 25th Street and 11th Ave in Manhattan.

Selco Scope

  • Power distribution products 
  • Signal cages
  • Cable tray and fittings. 
  • 3rd rail track material, brackets, protection boards and insulators


Corona Yard

Corona Yard

Location: Queens, New York

Owner: New York City Transit Authority

Located by Citifield in Flushing Meadows, this project was to modernize Corona Yard. This yard serves the IRT line of the New York City Subway.

Selco Scope

  • 3rd rail covers and brackets
  • Power distribution
  • Fabricated track pedestals for the train car shop
  • Signal platforms and brackets


CBTC

No.7 Flushing Line CBTC Signal Modernization

Owner: New York City Transit Authority

Part of this project was to furnish communication based train controls (CBTC), power and communications systems to the existing 9.4 mile Flushing Line from Times Square in Manhattan to Flushing Queens.

Selco Scope

  • Stainless steel cable tray
  • Aluminum cable tray
  • Messenger brackets
  • Signal platforms
  • Power distribution


East 180th Street Yard

East 180th Street Yard

Location: Bronx, New York

Owner: New York Transit Authority

This project upgraded the East 180th St Yard with a new signal system and track infrastructure that improves the operating efficiency through the yard.

Selco Scope

  • Stainless steel cable tray
  • Aluminum cable tray
  • Messenger brackets
  • Signal platforms
  • Power distribution


JFK AirTrain

JFK AirTrain

Location: Queens, New York

Owner: Port Authority of New York & New Jersey

$1.9 billion dollar project to construct 8.1 miles of a new Light Rail System to shuttle people to, from and around JFK International Airport.

Selco Scope

  • Guard rail 142,000 ft.
  • Aluminum cable tray for each station
  • Stainless steel cable tray connecting Airtrain to NYCT's Howard Beach Station
  • LIM Rail System
  • Structural steel at Jamaica Station (LIRR) and Howard Beach Station (NYCTA)


Contact Us




News

LaGuardia Airport Cooling Tower

Selco Manufacturing Corp., has been contracted to fabricate the Interim Cooling Tower as well as the Final Cooling Tower at the New LaGuardia Airport

NEMA 6P

Selco Manufacturing Corp., is now U.L. Listed for all Custom NEMA 6P Boxes.

Goethals Bridge Replacement Project

Selco Manufacturing Corp., has been awarded over 7500 Feet of Tube Railing for the Main Span as well as the Electrical Expansion Devices for multiple piers and the Cast Iron Barrier Boxes.

Portageville Bridge Project

Selco Manufacturing Corp., has partnered with American Bridge Company on the Portageville Bridge Project in Portageville, NY. We will be fabricating 2000 Feet of Aluminum Railing.