NYCT #S-32176 Signal System Modernization of King’s Highway Interlocking
Selco Scope:
3rd Rail Contact Rail Material
- Signal Platforms and Brackets.
- Signal Cages.
- Cable Tray and Fittings.
- Messenger Brackets
- Dead End Brackets
- Specialty Track Work and Relay Rooms
- Contact Rail Apertures
Ben Franklin Bridge
Selco Scope:
The work to be completed under this $150 million dollar contract consists of a complete replacement of the existing PATCO track, maintenance walkways, railings, structural repairs and bridge chambers.
- All 3rd Rail Transit track material including bridge chambers, steel work, 3rd Rail coverboards, brackets, insulators and expansion material and hardware.
- Replace existing bridge chambers (36) with new fabricated stainless steel chambers up to 9′ X 10′ X 8′ The chambers included all of the structural steel support steel.
- Impedance bond walkways.
- Walkway supports.
- Fixation channels.
No. 7 Line Extension
Selco Scope:
The No. 7 Line Subway is being extended from Times Square to W. 25th Street and 11th Ave in Manhattan.
- Power distribution products
- Signal cages
- Cable tray and fittings.
- 3rd rail track material, brackets, protection boards and insulators
Corona Yard
Selco Scope:
Located by Citifield in Flushing Meadows, this project was to modernize Corona Yard. This yard serves the IRT line of the New York City Subway.
- 3rd rail covers and brackets
- Power distribution
- Fabricated track pedestals for the train car shop
- Signal platforms and brackets
No.7 Flushing Line CBTC Signal Modernization
Selco Scope:
Part of this project was to furnish communication based train controls (CBTC), power and communications systems to the existing 9.4 mile Flushing Line from Times Square in Manhattan to Flushing Queens.
- Stainless steel cable tray
- Aluminum cable tray
- Messenger brackets
- Signal platforms
- Power distribution
East 180th Street Yard
Selco Scope:
This project upgraded the East 180th St Yard with a new signal system and track infrastructure that improves the operating efficiency through the yard.
- Stainless steel cable tray
- Aluminum cable tray
- Messenger brackets
- Signal platforms
- Power distribution
JFK AirTrain
Selco Scope:
$1.9 billion dollar project to construct 8.1 miles of a new Light Rail System to shuttle people to, from and around JFK International Airport.
- Guard rail 142,000 ft.
- Aluminum cable tray for each station
- Stainless steel cable tray connecting Airtrain to NYCT’s Howard Beach Station
- LIM Rail System
- Structural steel at Jamaica Station (LIRR) and Howard Beach Station (NYCTA)