Marcus Hook Station
Selco Scope:
The bridge project consisted of replacing a 17 span bridge and replacing it with a 4 span 370’ bridge over Amtrak and Septa Tracks. The project included 4 retaining walls for the bridge approaches and 2 Septa Ramps for pedestrian access from the bridge.
- Fabricated all of the structural steel, railings, handrail, roof framing, for both SEPTA structures on either side of the tracks
Global Expansion Project
Selco Scope:
Global Terminal is the closest container terminal to the New York/New Jersey Harbor entrance located outside the Bayonne Bridge. The new 70 acre terminal will increase NY/NJ capacity. The new gate facilities will be expanded from 16 lanes to 29 lanes and will now serve both the new section and the existing 110-acre terminal. The dock space is being expanded to 2700 feet.
- 10- Steel tubular overhead sign structures (80′ ft span)
- 10- Waterside structures
Sinatra Park & Castle Point Waterfront Restoration
Selco Scope:
The project was to rebuild the pier and platform for the waterfront soccer field which collapsed in 2009. An adjacent parking lot used by Stevens Institute of Technology collapsed three years earlier in 2006.
- Ornamental sea railing 340 feet
- Refurbished 510 feet of sea railing to match existing railing.
Tinton Falls Solar Power Project
Selco Scope:
An $80 million dollar Solar Power Project. This project spread over 100 acres of land in Monmouth County and was comprised of 85,000 solar panels. This is the largest Solar Power Project in New Jersey and one of the largest on the East Coast. The electricity generated from this project is sufficient enough to power nearly 3,000 homes per day.
- Fabricated all of the Inverter Platforms in 40′ sections.
Hudson River Park - Recreational Piers
Selco Scope:
Demolition and new construction of recreational piers including the development of a 550 acre park spanning 5 miles along the Hudson River in Manhattan.
- Fabricated the steel gangways and planks
Bayway Refinery
Selco scope:
- Fabricated three 50’walkways